PAWSD.org
Dry Gulch Reservoir
Studies and Reports
 
Click on the link below to read or download the study or report of your choice.  These are all in pdf format, and the sizes of larger files are designated.
 
Water Rights Decisions
 
 
Reports Regarding Future Water Demands
 
 
Estimated PAWSD Future Raw Water Demands (Harris Water Engineering, January 2007)
 
Please note:  Updated cost projections scheduled for February 23, 2009.
 
 
Documents Regarding Loan for Land Acquisition
 
Dry Gulch Reservoir Project Feasibility Study (1.2 MB) (Harris Water Engineering, August 2007)
 
 
 
 
Reports Regarding Project Alternatives
 
Alternative Reservoir Site Evaluation Appaisal Level Study (4.4 MB) (Harris Water Engineering, 1989) Important note:  This evaluation was conducted before the area served by Archuleta Water Company and the Town of Pagosa Springs were included into the PAWSD.
 
Preliminary Engineering Study of Water Supply Alternatives (5 MB) (Davis Engineering and Harris Water Engineering, 2003)
 
 
 
 

Phone: 970-731-2691 email: info@pawsd.org
2003 - 2008 PAWSD. All Rights Reserved.